PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing the Main sprinkler piping at the 1st Floor Facing North (800x600).jpg Installed metal decking at the roof Facing East (800x600).jpg Installed split wire at the (800x600).jpg Installing split wire above the cealing at the 3rd Floor Facing North (800x600).jpg Installing top track at the 2nd Floor Facing North-East (800x600).jpg Plumbing material for the 3rd floor bathrooms Facing East (800x600).jpg
Previous pageNext page Installed metal decking at the roof Facing East (800x600)
Installed metal decking at the roof Facing East (800x600)